|
| |
 |
|
ROADWAYS & BRIDGES |
|
|
Roadways |
|
|
Lotspeich
and Associates, Inc. (L&A) has performed
ecological assessments for numerous roadway and linear transportation projects throughout Florida.
The scope of services for these projects has
included early corridor evaluation, PD&E (and Roadway Conceptual
Analysis - RCA in Orange County), and final design studies.
L&A has also supported
numerous miscellaneous design contracts,
re-paving projects, and sidewalk enhancement
projects.
L&A understands its role as part of a project design team - from the early
research necessary to submit a Letter of Interest (LOI) through the
presentation and selection process, and finally with the scope and
man-hour negotiation process. Our administrative support
process ensures
that
our involvement with the project team is seamless,
and that the client/agency is fully supported through all
phases of the project.
Our knowledge of the
roadway design process, along with our natural systems and
regulatory experience, provides L&A a unique opportunity to support
all sizes and types of engineering and
planning firms throughout this process.
|
|
Representative Projects
-
East Orange County Transportation Needs Study, Orange
County
-
Apopka-Vineland Road, Orange County
-
U.S. 301 Multimodal Corridor Study,
Sarasota County
-
Narcoossee Road, Orange County
-
Corridor Feasibility
Studies, City of Oviedo
-
Interstate 4 Multimodal Corridor Study
-
SW 31st Street Phase II, Ocala - Marion
County
-
Marion County Corridor Study Master Plan
-
Equestrian Bridge at Interstate 95
-
S.R. 500 (multiple sections), FDOT 5
-
S.R. 26A, FDOT 2
-
Seminole Pratt Whitney Roadway
Improvement, Palm Beach County
|
|
Representative Projects
-
Little St. Mary's Bridge PD&E, Nassau County
-
Old San Mateo Road over Mill Creek
Bridge, Putnam County
-
Lake County Bridges (Lake Minneola/
Minnehaha), Lake County
-
Sante Fe River Bridge PD&E and Final
Design, Alachua County
-
S.R. 100 Bridge Widening over Alligator
Creek, Bradford County
-
Goat Creek Bridge Replacement, Brevard County
-
Equestrian Bridge at Interstate 95,
Flagler County
-
Lake Norris Road Bridge Replacement, Lake
County
-
New River Bridge, Bradford & Union County
|
|
|
Bridges |
|
L&A has performed ecological assessments
of bridge corridors for numerous projects throughout Florida. The scope of services for these projects involves a general overview of the corridor, identification of wetlands requiring permits, threatened and endangered species surveys, preparation of the environmental portion of the permit submittals, jurisdictional reviews with
regulatory agencies to confirm the extent of jurisdiction, and
selection of
final alignment alternatives.
Final alignment evaluations include aerial photo-interpretation of the entire study corridor, on-site reviews to validate photo-interpretation,
an assessment of any protected plant or animal species, and subsequent site specific surveys where necessary.
An Ecological Assessment Report is
submitted to the prime consultant for submittal to the client.
The report includes sections on assessment methodology, results, suggested alternatives, and specific permitting
requirements of the USACE and Water Management District(s), as well as any
special issues such as Navigational Clearance from the U.S. Coast Guard, Outstanding Florida Waters designations, and/or Wild and Scenic Rivers designations from the
State of Florida.
 |
|
|
|
 |
|